Columbia, South Carolina
Design-Builder: Gray Construction
Designer: Gray Construction
Duration: 22 months
Manufactory facility and office building
Total investment - $300,000,000.00
Facility overall size – 810,000 SF, concrete and structural steel
Associated substation, batch house, raw material, rail unloading, water tower, cool station, oxygen station, gas station, rail track and storage track.